NIMBY Rails
Renfe Cernanías Civia 465
Mostrando 1-6 de 6 aportaciones
Actualización: 29 JUL 2021 a las 14:35

- Max speed update to 160 Kph (design speed)

Actualización: 25 JUL 2021 a las 6:01

Design update:
- Now, base and decor colors are editable
- Some small details added

Actualización: 24 JUL 2021 a las 8:55

- Locomotive modified (small detail added on the front).
- New locomotive added with connection for another locomotive (same stats as original locomotive).

Actualización: 24 JUL 2021 a las 4:14

- Full redesign to a better quality and realistic one (it was a bit dificult because there are not so many blueprints or images of the top of the train).
- Mid car added.

Actualización: 23 JUL 2021 a las 13:02

Price modificated to a close real one (real is between 4.5M and 7M euros for a 1-3-1 standar)
Small cost modification (now is a bit expensive per day)
Power edited (real power is 2200Kw in all the 1-3-1, so now is 1100Kw each loco)

Actualización: 23 JUL 2021 a las 12:08