NIMBY Rails

NIMBY Rails

Renfe Cernanías Civia 465
Affichage des entrées 1-6 sur 6
Mis à jour le : 29 juil. 2021 à 14h35

- Max speed update to 160 Kph (design speed)

Mis à jour le : 25 juil. 2021 à 6h01

Design update:
- Now, base and decor colors are editable
- Some small details added

Mis à jour le : 24 juil. 2021 à 8h55

- Locomotive modified (small detail added on the front).
- New locomotive added with connection for another locomotive (same stats as original locomotive).

Mis à jour le : 24 juil. 2021 à 4h14

- Full redesign to a better quality and realistic one (it was a bit dificult because there are not so many blueprints or images of the top of the train).
- Mid car added.

Mis à jour le : 23 juil. 2021 à 13h02

Price modificated to a close real one (real is between 4.5M and 7M euros for a 1-3-1 standar)
Small cost modification (now is a bit expensive per day)
Power edited (real power is 2200Kw in all the 1-3-1, so now is 1100Kw each loco)

Mis à jour le : 23 juil. 2021 à 12h08