NIMBY Rails

NIMBY Rails

Renfe Cernanías Civia 465
Viser 1-6 af 6 forekomster
Opdatering: 29. juli 2021 kl. 14:35

- Max speed update to 160 Kph (design speed)

Opdatering: 25. juli 2021 kl. 6:01

Design update:
- Now, base and decor colors are editable
- Some small details added

Opdatering: 24. juli 2021 kl. 8:55

- Locomotive modified (small detail added on the front).
- New locomotive added with connection for another locomotive (same stats as original locomotive).

Opdatering: 24. juli 2021 kl. 4:14

- Full redesign to a better quality and realistic one (it was a bit dificult because there are not so many blueprints or images of the top of the train).
- Mid car added.

Opdatering: 23. juli 2021 kl. 13:02

Price modificated to a close real one (real is between 4.5M and 7M euros for a 1-3-1 standar)
Small cost modification (now is a bit expensive per day)
Power edited (real power is 2200Kw in all the 1-3-1, so now is 1100Kw each loco)

Opdatering: 23. juli 2021 kl. 12:08