RimWorld

RimWorld

Work Tab (Continued)
 This topic has been pinned, so it's probably important
0。0  [developer] 2 Jun @ 9:29pm
Feature Requests
Come on, say something smart — I know you've got that brilliant brain working.
Last edited by 0。0; 12 Jul @ 4:43pm
< >
Showing 1-8 of 8 comments
Kupie 11 Jul @ 4:40pm 
Could we get an option for vertical text? Like in "Compact Work Tab" mod:

https://raw.githubusercontent.com/CaptainArbitrary/CompactWorkTab/main/.github/README/Nice_Work_Tab.png

https://raw.githubusercontent.com/CaptainArbitrary/CompactWorkTab/main/.github/README/Nice_Work_Tab_Vertical.png

"Compact Work Tab" works pretty nice, but the work tab ends up being too short and cuts off all the text anyway. Either something built in to make it vertical or to make the tab taller when vertical (from being set by the other mod) would be perfect!
0。0  [developer] 12 Jul @ 1:24am 
@Kupie
To be honest, I’m actually not too keen on adding this feature directly into this mod. I’d prefer to implement it in a separate mod instead. Coincidentally, there’s already a similar mod in the community that does this — it just needs a bit of code tweaking to add compatibility. Also, I previously submitted a PR about this: See GitHub PR[github.com].
I'm not sure if this is the right place to put this, but this version of the mod seems to *missing* a feature from another 1.5 version I was using previously and I'm kind of keen to see it restored to the 1.6 version because I used it constantly.

I used to be able to highlight the name of the column, hold shift, and then scroll up and down to adjust the priority of the entire column simultaneously, but it seems that scrolling only affects the individual box I'm hovering over now, so I can't blank out an entire colony from doing a task or bump things up or down a level without having to do it with each individual member.
0。0  [developer] 12 Jul @ 4:19pm 
Originally posted by IceMaverick:
I'm not sure if this is the right place to put this, but this version of the mod seems to *missing* a feature from another 1.5 version I was using previously and I'm kind of keen to see it restored to the 1.6 version because I used it constantly.

I used to be able to highlight the name of the column, hold shift, and then scroll up and down to adjust the priority of the entire column simultaneously, but it seems that scrolling only affects the individual box I'm hovering over now, so I can't blank out an entire colony from doing a task or bump things up or down a level without having to do it with each individual member.

@IceMaverick
Thanks for the feedback — this bug will be fixed in the next update.
Last edited by 0。0; 12 Jul @ 7:52pm
Hey I appreciate you fixing that. I never realized just how much I was relying on that feature to setup my work tabs on new colonies (something I'm doing a lot of while my modlist is being updated). Absolute lifesaver getting that feature back in. Thank you very much.
我有些想法:
1. 与BPC功能的联动,pawn的工作复制按钮右键可以粘贴到其他BPC方案里。
2. 给工作选项上锁,使得其不被shift左右键影响。
3. shift左键点击pawn名字框,类似这个功能,但不包括未勾选的工作。因为我想临时添加工作而该优先级比较靠后,我会用到shift左键使其他已勾选的工作优先级数值-1,但是这样一来其他未勾选的工作就全都勾选成最低优先级了,把这些不想要的工作全部去掉很是费事。
I am not sure if it is even possible but a special job for cutting blight would be really handy. As I understan it is now part of the cutting plant job and i don`t really want to preoritse clearing out animal pens, too.
Triobian 22 Sep @ 10:59am 
Hey 0.0, is it possible to switch which number is in the main box? For example Cooking, and 3 of its sub tasks Bake, Cook, and Prep. If I set Bake to 1, Cook to 2, and Prep to 3, the Cooking task is 1, as its the highest priority. I would love a configuration setting that reversed that, so it showed the lowest priority first, instead of the highest.

Reason being, I have a "Basic" work setting that sets unskilled tasks that don't get XP to be done by everyone first. So for example they all will empty a drying rack or deliver resources to a project, since those tasks don't earn XP or affect the result. But it is difficult to see who is doing what work when half of the work priorities are set to 1, when in reality its a single sub task that has that priority, not the majority.
< >
Showing 1-8 of 8 comments
Per page: 1530 50