How did anyone beat itteration 66?
The rods physicaly cannot be lowered fast enough before the system blows. I've already tried a whistle blower team that on EVERY cycle tests the value to make for the fastest response time through the M cache. Even THAT cant lower it fast enough. 50 units (inputed by writing 100) simply is too slow. Every other iteration works UNTIL I hit 66.
Last edited by rocketdrive; 15 Dec, 2018 @ 11:50pm
< >
Showing 1-2 of 2 comments
ekimekim  [developer] 29 May, 2019 @ 6:14pm 
I let the RNG decide the test parameters, and my solution worked but it was definitely harder than intended. I might try to go tweak the settings to fix that, since this part wasn't meant to be so hard.
landvaarder 10 Oct, 2019 @ 1:23pm 
if you still have problems, i solved it with the aforementioned whistle blower that when it went off sent an M message and turned the pump to full.
the control rod i had it sync with void M and @rep 20 copy 100 to control.
< >