EXAPUNKS

EXAPUNKS

REACTOR 1: MONITOR (NUCLEAR PLANT A235X)
rocketdrive 15. dec. 2018 kl. 23:49
How did anyone beat itteration 66?
The rods physicaly cannot be lowered fast enough before the system blows. I've already tried a whistle blower team that on EVERY cycle tests the value to make for the fastest response time through the M cache. Even THAT cant lower it fast enough. 50 units (inputed by writing 100) simply is too slow. Every other iteration works UNTIL I hit 66.
Sidst redigeret af rocketdrive; 15. dec. 2018 kl. 23:50
< >
Viser 1-2 af 2 kommentarer
ekimekim  [udvikler] 29. maj 2019 kl. 18:14 
I let the RNG decide the test parameters, and my solution worked but it was definitely harder than intended. I might try to go tweak the settings to fix that, since this part wasn't meant to be so hard.
landvaarder 10. okt. 2019 kl. 13:23 
if you still have problems, i solved it with the aforementioned whistle blower that when it went off sent an M message and turned the pump to full.
the control rod i had it sync with void M and @rep 20 copy 100 to control.
< >
Viser 1-2 af 2 kommentarer
Per side: 1530 50