Counter-Strike 2
Furnace
Показані результати 1–10 із 18
< 1  2 >
Оновлено: 26 жовт. 2021 о 11:06

- reworked T spawn
- reworked B pathing
- reworked A site cover
- adjusted canal

Оновлено: 2 серп. 2021 о 13:05

- reworked T spawn
- reworked canal and A long
- simplified B approach
- reworked B site

Оновлено: 7 лип. 2021 о 13:43

Оновлено: 7 лип. 2021 о 13:22

- reworked A long
- added central cover at A site
- added sqeaky door between A long and side room / courtyard
- added cover to B long
- removed cover in canal house
- tweaked plantzone at B site
- added metal grating at B site
- removed a box at B site
- reworked cover in courtyard

Оновлено: 17 черв. 2021 о 12:02

- reworked canal area
- reworked B short
- opened up roof and moved cover at B long
- altered engagement in tunnel (B site)

Оновлено: 30 трав. 2021 о 13:22

Оновлено: 30 трав. 2021 о 11:28

- increased contrast of bombsite A backdrop
- changed railing on bombsite A
- removed two boxes near bombsite A

Оновлено: 24 трав. 2021 о 13:51

- major reworks of both bombsites and adjacent areas

Оновлено: 29 берез. 2021 о 14:42

- reworked ct-spawn and tunnel
- added cover at trainyard (long A)
- added minihut (long A)
- added cover at bombsite B
- closed central silo on bombsite B

Оновлено: 1 берез. 2021 о 15:04

- reworked connector
- moved silos and walls at B long
- widened t-spawn
- added pillar to canal
- added walltags for playtest purposes
- fixed clipping issues