Counter-Strike 2

Counter-Strike 2

Furnace
Se afișează 1-10 din 18 intrări
< 1  2 >
Actualizare: 26 oct. 2021 @ 11:06

- reworked T spawn
- reworked B pathing
- reworked A site cover
- adjusted canal

Actualizare: 2 aug. 2021 @ 13:05

- reworked T spawn
- reworked canal and A long
- simplified B approach
- reworked B site

Actualizare: 7 iul. 2021 @ 13:43

Actualizare: 7 iul. 2021 @ 13:22

- reworked A long
- added central cover at A site
- added sqeaky door between A long and side room / courtyard
- added cover to B long
- removed cover in canal house
- tweaked plantzone at B site
- added metal grating at B site
- removed a box at B site
- reworked cover in courtyard

Actualizare: 17 iun. 2021 @ 12:02

- reworked canal area
- reworked B short
- opened up roof and moved cover at B long
- altered engagement in tunnel (B site)

Actualizare: 30 mai 2021 @ 13:22

Actualizare: 30 mai 2021 @ 11:28

- increased contrast of bombsite A backdrop
- changed railing on bombsite A
- removed two boxes near bombsite A

Actualizare: 24 mai 2021 @ 13:51

- major reworks of both bombsites and adjacent areas

Actualizare: 29 mart. 2021 @ 14:42

- reworked ct-spawn and tunnel
- added cover at trainyard (long A)
- added minihut (long A)
- added cover at bombsite B
- closed central silo on bombsite B

Actualizare: 1 mart. 2021 @ 15:04

- reworked connector
- moved silos and walls at B long
- widened t-spawn
- added pillar to canal
- added walltags for playtest purposes
- fixed clipping issues