Diesel Railcar Simulator

Diesel Railcar Simulator

Newbury Branchlines 1.60
1-10 van 17 items weergegeven
< 1  2 >
Update: 27 dec 2023 om 13:55

Changed thumbnail

Update: 30 mei 2023 om 5:36

Updated thumbnail to display 'Not yet updated for the Scenery update' message

Update: 14 feb 2020 om 9:29

Update: 14 feb 2020 om 5:37

1.60:

-9 new passenger stations
-Added the Lambourn Valley Branch North West of Newbury, including the RAF Welford Branch
-New Class 37 Services including passenger, post and freight runs
-Tweaks to the DN&SR including the addition of Winchester (main station) and created the tunnel at Winchester Chesil (the very first tunnel in Diesel Railcar Simulator)
-A variety of new 'unique' services
-Various bug fixes

Update: 7 dec 2019 om 15:15

Some tweaks around Newbury to reduce speed limit spam on the mini map and other various tweaks

Update: 1 dec 2019 om 12:14

Update: 1 dec 2019 om 7:53

Update: 1 dec 2019 om 7:51

Update: 1 dec 2019 om 7:34

Version 1.55 includes a number of tweaks that make the route more accurate to it's real life state in the 1960s. After WWII the Newbury to Didcot section was double tracked, this is now reflected in game. I've run into a few issue during this relatively simple upgrade which means it is possible that I may have missed something during testing, please leave a comment if you find an issue and I will correct it ASAP.
Furthermore, there are more tweaks that I would like to introduce to make the route more realistic but I will leave these for the update that will bring the Lambourn Valley railway (North West of Newbury) as this will require some major tweaks to the timetable.

Update: 23 okt 2019 om 11:52