Barotrauma
Cyclops M-class
Wyświetlanie 21-30 z 69 pozycji
< 1  2  3  4  5  6  7 >
Aktualizacja: 14 sierpnia 2019 o godz. 15:44

Removed the lights-out logic from the reactor shutoff logic. Added indicator lights to the backup batteries

Aktualizacja: 14 sierpnia 2019 o godz. 15:20

Added logic that in the case of the reactor output reaching zero, oxygen generation and lighting turn off. Added so that the ship's computer warns the crew of the power-outage.

Aktualizacja: 14 sierpnia 2019 o godz. 9:20

Added c-4 blocks to the railgun shells, and added a few decorative lights on the exterior

Aktualizacja: 14 sierpnia 2019 o godz. 9:05

Added diving suits to the upper docking port

Aktualizacja: 14 sierpnia 2019 o godz. 9:03

Added a backup battery array that activates once the reactor stops, and added a duct block to drain the upper docking room

Aktualizacja: 10 sierpnia 2019 o godz. 11:29

Lowered the floor below the junction boxes, and connected the hull between engineering and electrical

Aktualizacja: 3 sierpnia 2019 o godz. 7:12

Added indicator lights to the emergency door override buttons

Aktualizacja: 3 sierpnia 2019 o godz. 7:09

Fixed the airlock door override switches

Aktualizacja: 3 sierpnia 2019 o godz. 7:00

Aktualizacja: 3 sierpnia 2019 o godz. 6:09

Moved the keel turret back more, and adjusted the bottom hull