工人與資源:蘇維埃共和國 Workers & Resources: Soviet Republic

工人與資源:蘇維埃共和國 Workers & Resources: Soviet Republic

101 次評價
Small town Stalinka
   
獎勵
加入最愛
已加入最愛
移除最愛
Building
Buildings (by category): Residential
檔案大小
發佈於
更新時間
24.837 MB
2021 年 9 月 25 日 上午 6:20
2021 年 10 月 14 日 下午 1:48
7 項更新註記 (檢視)

訂閱以下載
Small town Stalinka

描述
This 1940s-1950s residential is inspired from an existing pair of mirrored buildings in the mining town of Minyar, located in the Urals.
The courtyard side facades and entrances are improvised.
Self-heating is available.
Has 3 pedestrian connections, placed for practicality, not realism (which is quite a complication for L-shaped buildings).
Houses 66 adults at 85pc.

Updated with LOD.

Added an improvised straight variant so that you can make cute harmonious districts :)


tips? https://paypal.me/gosstroy0
27 則留言
Comrade Joe  [作者] 2023 年 4 月 10 日 下午 2:28 
hmm, could be because of the Γ shape. Or maybe I fucked up some numbers in the script, sorry ^^
Valdemar 2023 年 1 月 1 日 上午 8:27 
During the construction excavator and mud heaps location is outside of the building
Shotkey 2021 年 10 月 24 日 上午 2:19 
Perfect !
HmoWW 2021 年 10 月 14 日 下午 2:03 
thanks
Comrade Joe  [作者] 2021 年 10 月 14 日 下午 1:52 
OK, I think it should be fixed now.
I made a little change in the script regarding the materials for the roof stage and now it has a non-0 workdays for completion.

Not sure why this problem happened here though, I think it was always possible to define all construction materials manually before.
Comrade Joe  [作者] 2021 年 10 月 14 日 下午 1:07 
oooooh now I understand what you say, I initially thought the the construction ended up being stopped after the brick phase, but you say it gets finished without getting to the roof stage.
Now that's not something I've encountered before. But it does happen as you described it.

I'll look to see if I can fix it.
HmoWW 2021 年 10 月 14 日 上午 10:34 
so i checked right now
for i shaped building

for the stage of laying bricks needed: 278 work days 23t bricks 7.9t wood 3t steel
to end construction: 278 work days 26t bricks 16t wood 6t steel

so there is materials for 3rd stage but there is no work days for 3rd stage

because of that building is finished early without 3rd stage
and this is the same for all 3 buildings
Comrade Joe  [作者] 2021 年 10 月 14 日 上午 9:45 
I can't reproduce the problem. CO-led construction worked out fine for me for all 3 objects.
Can you help me a bit with the specifics?
Comrade Joe  [作者] 2021 年 10 月 14 日 上午 8:56 
shit, for real?
I'll test it right away, odds are I know what's causing it as I encountered it in the past, but thought I have made sure it wasn't gonna be an issue this time.
HmoWW 2021 年 10 月 10 日 下午 1:10 
there is an issue with last stage of construction

construction ends on a stage of laying bricks