安裝 Steam
登入
|
語言
簡體中文
日本語(日文)
한국어(韓文)
ไทย(泰文)
Български(保加利亞文)
Čeština(捷克文)
Dansk(丹麥文)
Deutsch(德文)
English(英文)
Español - España(西班牙文 - 西班牙)
Español - Latinoamérica(西班牙文 - 拉丁美洲)
Ελληνικά(希臘文)
Français(法文)
Italiano(義大利文)
Bahasa Indonesia(印尼語)
Magyar(匈牙利文)
Nederlands(荷蘭文)
Norsk(挪威文)
Polski(波蘭文)
Português(葡萄牙文 - 葡萄牙)
Português - Brasil(葡萄牙文 - 巴西)
Română(羅馬尼亞文)
Русский(俄文)
Suomi(芬蘭文)
Svenska(瑞典文)
Türkçe(土耳其文)
tiếng Việt(越南文)
Українська(烏克蘭文)
回報翻譯問題









I made a little change in the script regarding the materials for the roof stage and now it has a non-0 workdays for completion.
Not sure why this problem happened here though, I think it was always possible to define all construction materials manually before.
Now that's not something I've encountered before. But it does happen as you described it.
I'll look to see if I can fix it.
for i shaped building
for the stage of laying bricks needed: 278 work days 23t bricks 7.9t wood 3t steel
to end construction: 278 work days 26t bricks 16t wood 6t steel
so there is materials for 3rd stage but there is no work days for 3rd stage
because of that building is finished early without 3rd stage
and this is the same for all 3 buildings
Can you help me a bit with the specifics?
I'll test it right away, odds are I know what's causing it as I encountered it in the past, but thought I have made sure it wasn't gonna be an issue this time.
construction ends on a stage of laying bricks