Nainstalovat Steam						
					
				
				
									přihlásit se
											 | 
						jazyk
						
																																					简体中文 (Zjednodušená čínština)
																													繁體中文 (Tradiční čínština)
																													日本語 (Japonština)
																													한국어 (Korejština)
																													ไทย (Thajština)
																													български (Bulharština)
																																							Dansk (Dánština)
																													Deutsch (Němčina)
																													English (Angličtina)
																													Español-España (Evropská španělština)
																													Español-Latinoamérica (Latin. španělština)
																													Ελληνικά (Řečtina)
																													Français (Francouzština)
																													Italiano (Italština)
																													Bahasa Indonesia (Indonéština)
																													Magyar (Maďarština)
																													Nederlands (Nizozemština)
																													Norsk (Norština)
																													Polski (Polština)
																													Português (Evropská portugalština)
																													Português-Brasil (Brazilská portugalština)
																													Română (Rumunština)
																													Русский (Ruština)
																													Suomi (Finština)
																													Svenska (Švédština)
																													Türkçe (Turečtina)
																													Tiếng Việt (Vietnamština)
																													Українська (Ukrajinština)
																									Nahlásit problém s překladem
							
						
											


						
						




I made a little change in the script regarding the materials for the roof stage and now it has a non-0 workdays for completion.
Not sure why this problem happened here though, I think it was always possible to define all construction materials manually before.
Now that's not something I've encountered before. But it does happen as you described it.
I'll look to see if I can fix it.
for i shaped building
for the stage of laying bricks needed: 278 work days 23t bricks 7.9t wood 3t steel
to end construction: 278 work days 26t bricks 16t wood 6t steel
so there is materials for 3rd stage but there is no work days for 3rd stage
because of that building is finished early without 3rd stage
and this is the same for all 3 buildings
Can you help me a bit with the specifics?
I'll test it right away, odds are I know what's causing it as I encountered it in the past, but thought I have made sure it wasn't gonna be an issue this time.
construction ends on a stage of laying bricks