Rail Route

Rail Route

Tulmye Gorge
1 Komentar
AlFaraS'ulTane 11 Mei 2022 @ 2:11pm 
I was wondering about the last line of your description, but it indeed proved to be a challenge. Especially trying to keep seperation between IC and COM lines between Nerlim, Barlowe, Rat Grove, Tulmye and Fork cliffs. if you assign the upper tunnel east of Barlowe to IC only while keeping a 2-way track most of the area between FC and Dancer, it's doable but a mess to keep all COM routes as optimal (distance) as possible.
Also great area in front of Nerlim.