Transport Fever 2
[CRRS]China Railway General Speed Station - Dazhou Station
กำลังแสดง 1-10 จาก 12 รายการ
< 1  2 >
อัปเดต: 15 ต.ค. @ 1: 15am
โดย 冷冻大虾

Fixes:
Fixed the issue of train doors opening on the wrong side at Platforms 2 and 4.
Fixed the station sign offset issue when using custom station names.
Optimizations:
Optimized the safety warning text along the platform edge.
Additions:
Added a "No Entry" sign at the end of the platform.

อัปเดต: 12 ต.ค. @ 1: 34am
โดย 冷冻大虾

Fixes:
Fixed the issue where modular station buildings could not connect to roads
Optimizations:
Optimized the size and spacing of platform edge warnings

อัปเดต: 2 ต.ค. @ 12: 36am
โดย 冷冻大虾

Fixes:
Fixed the issue of overly dark textures in the commercial area inside the station building.
Optimizations:
Optimized the size of the return line contact points.

อัปเดต: 1 ต.ค. @ 5: 02am
โดย 冷冻大虾

Additions:
Added interior structure and details of the station building
Added interior structure and details of the elevated waiting room
Added safety warning markings along platform edges
Optimizations:
Comprehensively optimized platform texture flickering
Optimized shadows at the exit
Optimized pedestrian flow paths within the station building and elevated waiting room

อัปเดต: 21 ส.ค. @ 3: 15am
โดย 冷冻大虾

Optimized custom station names

อัปเดต: 20 ส.ค. @ 2: 39am
โดย 冷冻大虾

Increase platform passenger capacity

อัปเดต: 18 ส.ค. @ 5: 55am
โดย 冷冻大虾

อัปเดต: 18 ส.ค. @ 5: 45am
โดย 冷冻大虾

Fixed an occasional conflict issue with site connections
Fixed the problem that when the platform wide sleeper track is connected with the ballast track, the ballasted track foundation will affect the wide sleeper track

อัปเดต: 6 ส.ค. @ 3: 01am
โดย 冷冻大虾

The second phase of the project was released shockingly!

อัปเดต: 7 ก.ค. @ 1: 42am
โดย 冷冻大虾

Compatible with CRST flyover connection