铁路调度模拟器

铁路调度模拟器

ECML: York
正在显示第 1 - 5 项,共 5 项条目
更新于:1 月 7 日 上午 11:18

Altered contract generation weights of Sherburn-in-Elmet, Church Fenton and Ullskelf.

更新于:1 月 7 日 上午 9:18

Leeds and Doncaster stations have been altered to include missing platforms and through lines.

Additional portals have been added around Leeds (Kirkstall Forge, Bramley, Cottingley and Outwood)

Tunnels added up line of Northallerton that cross under ECML as part of the avoiding line.

Further minor wall alterations


更新于:2024 年 10 月 16 日 上午 8:38

Further wall alterations

更新于:2024 年 10 月 16 日 上午 7:28

Altered a wall that prevented track to be built to the mainline autoblock between Doncaster and York

更新于:2024 年 10 月 15 日 上午 10:55