Victoria 3
Power Plants Plus & Industry Expanded Compatibility Patch
Se afișează 1-4 din 4 intrări
Actualizare: 3 mart. 2024 @ 10:12

Actualizare: 13 ian. 2024 @ 13:17

-Added support for Industry Expanded v10.0
-Minor Change: Automation PMs from IEX do not grant electricity generation multiplier, gives flat throughput bonus as before
-Automatic Power Plant PM throughput bonus increased from 8% to 10% to match IEX v10.0's structure

Actualizare: 18 dec. 2023 @ 6:51

Actualizare: 18 dec. 2023 @ 6:39

Uploaded :)