Victoria 3

Victoria 3

Realistic Power Plants
Viser 1–9 av 9 bidrag
Oppdatering: 2. jan. 2023 @ 5.10

- Fixed a bug preventing hydroelectric plants from being built in Ontario.

Oppdatering: 5. des. 2022 @ 3.26

Oppdatering: 2. des. 2022 @ 5.16

- Updated hydro power plant art.

Oppdatering: 1. des. 2022 @ 21.23

Oppdatering: 1. des. 2022 @ 20.59

- Jotunheimen, Glomma, Nordfjella, Magdalena, Orinoco, Colorado River is added

- Fixed a bug that prevented hydro plants from being built where there was a hydro power plant output trait.

Oppdatering: 25. nov. 2022 @ 21.09

- Hydroelectric power plant efficiency patched to be the best among all power generation efficiencies.

Oppdatering: 25. nov. 2022 @ 20.17

Oppdatering: 25. nov. 2022 @ 19.40

Oppdatering: 25. nov. 2022 @ 19.37