Arma 3
New Mombasa (WIP)
Viser 11–19 av 19 bidrag
< 1  >
Oppdatering: 3. sep. 2021 @ 17.25

- Terraformed the port area.

Oppdatering: 3. sep. 2021 @ 14.21

- Flattened airport area

Oppdatering: 2. sep. 2021 @ 13.54

- Added highways.

Oppdatering: 31. aug. 2021 @ 16.53

- Expanded alpha site so a bigger building fits.

Oppdatering: 31. aug. 2021 @ 8.51

Oppdatering: 31. aug. 2021 @ 4.56

- changed height of uplift reserve area accoridng to games.

Oppdatering: 30. aug. 2021 @ 10.24

- Added basic area of alpha site.

Oppdatering: 30. aug. 2021 @ 2.01

- Rotated the terrain so it matches the real world location..

Oppdatering: 29. aug. 2021 @ 13.54