Stormworks: Build and Rescue

Stormworks: Build and Rescue

SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I (VALKYRIE Mk.II Update)
Showing 21-30 of 44 entries
< 1  2  3  4  5 >
Update: 18 Sep, 2021 @ 10:55pm

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I. - MAINTENANCE UPDATE

Large Number of Updates and Enhancements. The MAINTENANCE update provides the ability to open the Reactor Core, extract the Extract Rods and raise them through to the entrance of the maintenance hatch for replacement. This is done via a Reactor Door located in the floor of the Reactor Room. Process...
1. Using the MAINTENANCE panel located in the centre of the room Click on the MAINTENANCE button. This will disable the reactor from starting and allow access to the various Maintenance services.
2. In order to be able to open the Floor Door the reactor must be at 75% Water in the Reactor Pool. Flip the switch on the Maintenance Panel to transfer water from the Reactor Pool to a Holding tank.
3. Once the Water is at 75% the two monitors will switch to Keylock pads. Enter 5468 in to each pad to disable to the two Reactor Locks and release the seal.
4. On the panel use the two arrow buttons to raise and lower the Reactor Door. Once the door is at full height you can use the Flip Switch to Retract the Fuel Rod sled from the Reactor. An elevator will lift the sled on slide rails.
5. Once the Fuel sled is even with the top of the door press the RELEASE SLIDE from elevator button to allow the sled to move along the rails to the Maintenance Hatch.
6. At the Hatch Entrance enter 5468 to open the large Maintenance Hatch.
7. Move to the LIFT ARM controls and turn them on. This is still WIP in progress so all that is available is MANUAL control. Use the SLIDE and HINGE rotate commands to move the Hardpoint down over the Rail Sled and grab the Top HardPoint.
8. On the sled flip the switch to release the FUEL RODS from the sled. Using Rotate and Slide Keys you will be able to move the RODS in to a position where they will be standing straight up and down in the Maintenance Hatch ready to either be lift by a crane using Ropes or connected to the Central Main Hardpoint.

Lots of other enhancements including new REACTOR STATUS screens in both the C&C (both at SIT AWARE and STATUS PANEL) as well as in the REACTOR ROOM.
Additionally the Lighting and Alert system has been completely overhauled.

Next Update should be the Enhanced Incident System.

Update: 5 Sep, 2021 @ 12:20am

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I.

- Corrected some noted Typos and added additional details to descriptions as identified in the Comments
- Enhanced the FWD and AFT Ballast Gauges by having the RED Bar be equal to the Requested Ballast Value. White is equal to the Current Ballast Value.
- Added a Dial to the REACTOR Room in order to track the water level in the Reactor Pool
- Changed Emergency Surface depth to 3m to ensure the FENRIS will break the water surface quicker.

Update: 4 Sep, 2021 @ 5:22pm

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I.

- Fixed the issue of the AFT AIRLOCK Magnet being set to ON by Default

- Added Two Deployable Anchor Systems (PORT AFT, SB AFT) that are controlled from Panels on the wall just to the Right of the SONAR Station (SB Mid).

Update: 3 Sep, 2021 @ 11:19pm

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I.

- Added a HIDDEN BIG RED BUTTON under the desk of the SIT AWARE station (accessible through the table) that when click will switch the SIT AWARE screen to an INCIDENT GENERATION screen. From here you have the ability to start the following Incidents:
1. Flooding of specific Zones: TORPEDO ROOM, FWD CORRIDOR, C&C, REACTOR ROOM, AFT CORRIDOR
2. Disable the Reactor Control Rods from being able to be inserted in to the Reactor such that a reactor start will now result in a runaway radiation and temperature build-up result in Meltdown.

- Added a Key Switch to the Left of the Helmsman that allows you to fold-up and disable the AFT and FWD Dive Planes. This will allow for the FENRIS to fit closer against a dock or other vessel.

Update: 2 Sep, 2021 @ 12:04pm

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I.

- Fixed the issue with Zoom where at 0 FOV it was showing immediately adjacent blocks. The ZOOM still scales from 0-100 but properties have been set for the Starting FOV and Ending FOV and it will scale between those endpoints. Setting a Start FOV where the adjacent blocks don't appear fixed the issued.

Update: 2 Sep, 2021 @ 10:38am

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I.

- Changed all the Cameras to they are capable of IR, Zoom and activation of an associated IR Light. Controls are done on screen. Cameras that show up on multiple screens (FWT and AFT) can be controlled from any of the screens with the corresponding changes showing up on all others.
- Added an additional Camera (ANG - Angled Forward) that replaces the large search light beneath the FWD MID section. The Search Light has been replaced by other headlights (IR and Regular) that are in line with the camera. The ANG Camera is available to the Helmsman.

Update: 1 Sep, 2021 @ 11:34pm

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I.

- Readded Water Injection microcontrollers to Port and SB Boilers so that they will always maintain at least 1 Unit of Pressure when running. They feed from 2200L Fresh Water Tanks on both sides of the FENRIS. They injections are extremely small amounts (0.5-1L) every so often which is typically replenished by the Condensers which feed both the boiler and the Fresh Water Tanks.
- Added a dynamic trim calculation to the Automatic Pitch and Depth controller in order to account for the lifting forces of the FENRIS moving at speed. Depth Holding is now much more precise.

Update: 1 Sep, 2021 @ 1:16am

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I.

- Tweaking of the weight in order to account for the new Flywheels

Update: 1 Sep, 2021 @ 1:15am

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I.


***IGNORE: ISSUE with Upload

Update: 1 Sep, 2021 @ 12:21am

Updated SBS FENRIS Nuclear Powered Fast Attack Submarine - Mk.I.

- Tweaked the powerplant in order to increase the maximum generation output to 4951 SWatts per side for a total of 9902 SWatts
- Some spelling corrections on some buttons and panels