Oppdatering: 14. apr. 2022 @ 9.51

Added: Water supply point on the basis of the military filtration station VFS-10
Added: Drain point
Added: Water storage tanks: RDV-5000 tanks (from the VFS-10 kit)

Oppdatering: 13. apr. 2022 @ 2.39

Added: Field water intake point (a tanker truck for water intake is installed at the point)
Changed: Replacement of the model of the Field water distribution point (a tanker truck for distributing water to consumers is installed at the point)

Oppdatering: 11. apr. 2022 @ 7.30

Added: Helicopter landing pad (prefabricated metal coating K-1D)
Added: Helicopter loading pad (prefabricated metal coating K-1D)
Added: Field water collection point (a tanker truck is installed at the point to distribute water to consumers)

Oppdatering: 10. apr. 2022 @ 1.34

Oppdatering: 22. des. 2020 @ 3.24

Fixed: problems with electricity on LRV-1

Oppdatering: 20. okt. 2020 @ 10.42

Oppdatering: 13. okt. 2020 @ 13.21

Oppdatering: 13. okt. 2020 @ 12.36

Added: Transshipment base. (A warehouse with increased capacity that allows 16 vehicles to be serviced at the same time).

Oppdatering: 10. okt. 2020 @ 10.17

Oppdatering: 10. okt. 2020 @ 9.33

Added: Separate operational railway company. (railway depot). Because of the poles of the contact network (the poles can not be removed-they will stick out of the roof of the building), it is not possible to make a correct exit of the rolling stock.