缺氧
Mineral Processing - Metallurgy
目前顯示第 51-52 項,共 52 項
< 1  2  3  4  5  >
更新:2020 年 1 月 18 日 @ 下午 3:37

Fixed error in the volume of gas output of Petroleum Distillery.

更新:2020 年 1 月 16 日 @ 下午 8:16

Update 1

Added Molten Lead Recipe to the Advanced Kiln:
- Molten Lead (100kg): Lead (100kg) + Methane (10kg)

Add Molten Lead Recipe to the Glass Forge:
- Molten Lead (1000kg): Lead (1000kg) + Coal (100kg)

Update 2

Petroleum Distillery income amount fixed. Building changes as follow:
- Crude Oil Input: 10kg/s
- Petroleum Output: 5kg/s
- Energy Consumption: 480w
- Gas Output: 90g/s