Barotrauma

Barotrauma

[Outdated] Cyclops Mk-II
Visar 41–50 av 62 poster
< 1  2  3  4  5  6  7 >
Uppdatering: 19 jun, 2019 @ 2:37

Fixed some things with the Seamoth. Fixed propeller room door. Future Cyclops are going to require a complete power rewire due to bugs with relays.

Uppdatering: 19 jun, 2019 @ 0:06

Fixed minor issue with the toggle docking buttons on the lower right airlock.

Uppdatering: 18 jun, 2019 @ 23:50

Adjusted Airlock wiring to open when full of water or empty, or after a certain timeframe.

Uppdatering: 18 jun, 2019 @ 23:27

Redid engineering wiring and electrical layout. Added a third electrical discharger in the Aft Keel blindspot. Added a hatch to access the rear propeller section. Added some more equipment to the lockers. Bundled Seamoth into the workshop.

Uppdatering: 17 jun, 2019 @ 10:49

Rewired Reactor to fix phantom load issues, moved Backup Battery button.

Uppdatering: 17 jun, 2019 @ 10:05

Rewired batteries due to relays having trouble balancing load across batteries.

Uppdatering: 16 jun, 2019 @ 22:38

Adjusted some deterioration rates on the Seamoth.

Uppdatering: 16 jun, 2019 @ 22:28

Adjusted batteries and wiring on Seamoth.

Uppdatering: 16 jun, 2019 @ 21:13

Adjusted Oxygen output, made non-airlock doors clickable.

Uppdatering: 14 jun, 2019 @ 17:10

Finally hopefully completely fixed the airlock circuits. Added another large locker to the keel cargo area. Added some bits and bobs in some lockers.