Rolling Line

Rolling Line

switching operations
1–4/4 bejegyzés mutatása
Frissítés: 2018. aug. 5. @ 6:43

Update 1.03
-added some track to help operations and switching
-added details.

Frissítés: 2018. júl. 17. @ 19:19

Update 1.02
- expanded to next room
- new massive yard
- new coal electric plant
- new Winery

Frissítés: 2018. júl. 12. @ 6:34

Update 1.01
- added new signal assets and crossing assets
- changed and added some minor details
- fixed coal mine tunnel. hoppers should no longer drop to floor

Frissítés: 2018. júl. 10. @ 12:14

Initial version