Train Simulator Classic

Train Simulator Classic

42 arvostelua
UP 5336 Eastbound - Part 5
   
Palkinto
Lisää suosikkeihin
Lisätty suosikkeihin
Poista suosikeista
Tiedostokoko
Julkaistu
155.231 KB
8.10.2023 klo 8.13
1 muutos ( näytä )

Tilaa ladataksesi
UP 5336 Eastbound - Part 5

2 kokoelmassa, tekijä RBJets
Granger Heartland Series
53 luomusta
Donner Pass Series - Vol. II
41 luomusta
Kuvaus
(Scenario #43 in Granger Heartland Series - Scenario #31 in Donner Pass Series - Vol II)
The shunting crew in Keddie has placed the locos you'll be taking down to Reno after you drop your current consist. You will claim the locos and head towards Quincy Jct where your run on the Feather River route will end.

Loco: GE ES44AC UP Union Pacific - Difficulty: Easy - Length: 35 Mins

Click on above "Granger Heartland Series" or "Donner Pass Series - Vol. II" collection links for scenario list/order.
12 kommenttia
RBJets  [tekijä] 10.1.2024 klo 13.41 
Thanks Rob. :)
robmerlo 9.1.2024 klo 20.49 
good shunt and light engine finish
RBJets  [tekijä] 30.10.2023 klo 12.26 
Welcome Rammy, thanks. :)
Rammy 30.10.2023 klo 9.19 
Good Drop Off and Run Down to Quincy. Thank You.
RBJets  [tekijä] 21.10.2023 klo 9.27 
Thanks Warren, welcome. :)
wadawes 20.10.2023 klo 23.19 
Another good scenario, I always enjoy this route. Many thanks RB, cheers, Warren.
RBJets  [tekijä] 19.10.2023 klo 16.42 
Thanks as always Ken, welcome. :)
kengilbertson 19.10.2023 klo 13.33 
nice run into Keddie. Thanks for all your work.
RBJets  [tekijä] 9.10.2023 klo 8.21 
Welcome crlynch, thanks. :)
crlynch 9.10.2023 klo 1.06 
Great run out to the Junc. Very enjoyable Ta.